ENTERPRISE PROGRAMME · COMPANIES DOOR

Take delivery of complex work in phases.

Move multi-system integrations and internal tools forward without pulling core engineers off roadmap, backed by paid discovery, click-wrap NDA rooms, a vetted bench, and acceptance-gated phases.

Explicit pilot limits

PRICING
On quote
DATA RULE
Development runs on synthetic data; systems storing identity, health, or card data are out of scope in the pilot.
CERTIFICATIONS
No ISO 27001 or SOC 2 Type II claim today; 12-month roadmap shared transparently.
STAKEHOLDERS

Concrete proof for every veto point at the table.

Engineering, InfoSec, Operations, and Finance each review written artifacts instead of generic promises.

CTO / Engineering Lead

CORE CONCERN
External code introduces security flaws and technical debt that core engineers end up cleaning up.
APPROACH
Ship backlog integrations and internal tools without pulling core engineers off roadmap. Every delivery clears QA checklist v2, RBAC checks, and full handover.
CONCRETE PROOF
QA v2 report · SBOM license inventory · <=30 min rollback drill · AI boundary statement

CIO / InfoSec

CORE CONCERN
Contractors paste personal or commercial data into public AI tools and fail KVKK/GDPR audits.
APPROACH
Development runs on synthetic fixtures; client data never enters public AI training loops. Role isolation, DPA, and audit logs come standard.
CONCRETE PROOF
Data Processing Addendum (DPA) · sub-processor list · compliance flow · audit log export

COO / Operations Director

CORE CONCERN
Multi-month agency projects miss warehouse cut-overs and accountability disappears when things break.
APPROACH
Start with a five-working-day paid discovery to map baselines and acceptance criteria. Phases close only against signed tests with a named lead architect.
CONCRETE PROOF
5-day discovery scope doc · phased job card · 14-day backup builder SLA

CFO / Procurement

CORE CONCERN
Open-ended hourly billing balloons, or a contractor walks away mid-project.
APPROACH
Zero open-ended hourly billing. Every stage carries a fixed ceiling and acceptance gate; discovery fees credit conditionally toward stage one.
CONCRETE PROOF
Supplier onboarding card · stage acceptance record · written IP assignment annex
OFFER ARCHITECTURE

From five-day discovery to private NDA rooms and bench.

Every tier keeps the same written scope, QA checklist, and acceptance gate discipline.

Paid Discovery Program

PILOT
SCOPE
Five working days after a free 20-minute screening call: system and role map, difference baseline, scope/acceptance matrix, access and <=30 min rollback plan, go / no-go decision.
TERMS
If stage one is signed with the same account and developer within 30 days of discovery acceptance, part of the discovery fee is credited toward stage one.
PRICE
On quote

Enterprise Problem Sprint (2–4 weeks)

PILOT
SCOPE
Preparing a multi-system workflow or AI prototype for production inside an isolated test environment with cost, error, and hallucination boundaries.
TERMS
Fixed scope, written acceptance criteria, separate stage quote, and QA checklist v2.
PRICE
On quote

Private NDA Challenge Rooms

PILOT
SCOPE
Closed room for 500+ staff organizations: only identity- and reference-checked L2/L3 builders enter after signing click-wrap custom NDA + DPA.
TERMS
Managed triage filters submissions; full economic rights or non-exclusive license for the winning build pass in writing.
PRICE
On quote

Vetted Builder Bench

PILOT
SCOPE
Pre-vetted, NDA-cleared 3–10 builder L2/L3 capacity onboarded to your supplier system for quarterly or annual delivery.
TERMS
Defined P1 outage response targets in maintenance terms, 14-day L3 backup handover, and fixed per-stage tariffs.
PRICE
On quote

Outcome-Based Hybrid Stage

PILOT
SCOPE
Fixed base stage cost plus a milestone tranche released when shadow reconciliation or an agreed baseline metric is verified.
TERMS
Activated only with written provider/tax approval and a signed baseline measurement.
PRICE
On quote

Co-Marketing & Verified Cases

PILOT
SCOPE
Anonymized or named verified case study separating system acceptance records from developer statements, plus joint CTO technical sessions.
TERMS
Requires separate per-channel written consent; consent can be withdrawn at any time.
PRICE
By consent, free
PROCUREMENT-READY TRUST PACK

One structured file for legal, security, and procurement.

Contract templates, data boundaries, QA standards, and access controls packaged for vendor onboarding.

Read full trust rules

Master Services Agreement & Stage Annex

Scope, out-of-scope boundaries, acceptance criteria, and sign-off template for every phase.

Mutual NDA & KVKK/GDPR Data Processing Addendum (DPA)

Sub-processor register, retention/deletion rules, and contractual ban on sending client data to consumer AI tools.

QA Checklist v2 & License Inventory (SBOM)

20-scenario synthetic test run, role isolation, secret scan, rollback drill, and third-party open-source license declaration.

Access Matrix, Incident Response & Handover Plan

Organization role separation, 14-day backup builder handover rule, and audit log export specification.

Transparency rule: We never claim ISO 27001 or SOC 2 Type II certification before completing formal audits. Our active technical controls (synthetic dev fixtures, org isolation, audit logs, and QA v2) and 12-month certification roadmap are shared openly during procurement review.

Legal drafts (Turkish, pending counsel review): Terms of use · Privacy notice · Privacy policy

QUOTE RISK DIAGNOSTIC

Open-ended agency quotes vs. Kertiva written job cards.

Score any existing software proposal against these four procurement failure points.

Risk areaOpen-ended agency / hourly proposalKertiva written job card
Scope and completion boundaryOpen-ended hourly estimate or vague “turnkey” language; change-order friction mid-build.Five-day paid discovery document; scope, exclusions, and acceptance criteria fixed per phase.
Code and data boundariesClient records pasted into external AI tools; inconsistent secret or permission checks.Synthetic fixtures during development; delivery stays hidden until QA checklist v2 passes.
Payment vs. acceptanceCalendar-based milestones detached from working system tests.Funds stay with the licensed payment provider until your acceptance and support closure.
Key-person continuitySystem knowledge vanishes if a single contractor becomes unreachable.Written handover guide, explicit IP annex, and 14-day L3 backup builder reassignment.

Frame scope and procurement risk in a 20-minute call.

We review your systems, cut-over timeline, and acceptance rules first, then send a fixed written discovery proposal if it fits.

NEXT STEPS
For companiesInvited login

Measure page views, referring domains, UTM campaign tags, action button clicks and scroll depth.

Measure which ads bring visits using click identifiers from the page link.